All the Getbig experts have arrived now! Listen, Melvin, if you need to wrap a joint to train it you are doing something wrong. Do something else for a start.
That machine I made has stainless steel parts, special shafts and bearings and took a long time (over 120 hours!) to design then 6 months to build, plus it has been modified several times. It owes me at least
$30,000 and that doesn't include factory costs. I built it to see if I could make the best piece of gym equipment ever put in a gym. I think I succeeded. It doubles as a
Calf slide machine. That is why I increased the angle. We had a big bloke named Joe L who would load 700 pounds + on it for heel raises. On the low angle the shafts would bend
so I decided to make it steeper. Some guys don't like it now and said it was better before. Everyone is an expert in this game!