Only Trump tried to prevent ALGAE!!!!!

I mean, he didn't spend 35 million and take 2 years.....but hey, ALGAE!!!!
Scope of the Obama-Era Upgrades
The 2010–2012 project was a full reconstruction of the pool, which is over 2,000 feet long and sits between the Lincoln Memorial and the Washington Monument AP News. Key upgrades included:
Circulation and filtration system overhaul to replace stagnant water with river water from the nearby Tidal Basin AP News.
Leak and structural repairs, as the basin had begun to sink into the land dredged from the Potomac River AP News.
Shallowing the pool to save water and improve circulation AP News.
Tinting the pool’s bottom gray to make the water darker and more reflective of the Washington Monument AP News.
Paved walkways around the basin AP News.
These changes were intended as a long-term fix for persistent leaks, algae growth, and poor water quality that had plagued the site for decades factually.co.
Bringing in river water and making the pool even more shallow....what could go wrong?

Despite these upgrades, leaks and algae issues persisted after the Obama-era work, which critics have cited when assessing later repairs
Google is free, even for autistic retards.